Hopper Dredger conversion
Project Overview:
On behalf of the owner, we managed the complete design and procurement for the conversion of a trailing hopper dredger. The existing split hopper barge needed to be transformed into a hopper barge capable of discharging over the bow using a rainbow installation. Additionally, the vessel required the capability to discharge material from the hopper through a trailing pipe onto the seabed, as part of a dedicated Saipem project.
Scope of Work:
- 3D scan of the vessel
- Complete engineering and detailed design
- Hopper discharge system
- Modification of the piping system
- Construction and delivery of jet water monitors
- Delivery of a bow-coupling system
- Delivery of hydraulic monitoring and control systems
- Delivery of 650 mm diameter valves
- Supervision of the construction
- Numerous other smaller items
Recent Comments