BOW COUPLING
Our client a Dutch dredging contractor, was on an URGENT base in the need of new Bow Coupling system. Since the renowned makers are having lead through times which didn’t meet the project schedule, RR Maritime Engineering has been requested to design a custom Bow Coupling.
The complete design package (basic design, construction drawings and strength analyses) has been finalized ready for production on very limited time, where after a construction company pre-fabricated and installed the system onboard.
Recent Comments